Djarindjin-Lombadina Water Treatment Upgrade Project

WA / IS Essentials

Under the Essential and Municipal Services Upgrade Program (EMSUP), a Western Australian Government initiative, the Water Corporation has been funded to regularise and assume responsibility for operation and maintenance of water and wastewater assets across a number of Aboriginal Communities. Djarindjin and Lombadina are two of the communities that will receive upgrades under the EMSUP.

Read More
  • Certified
  • Social

Elizabeth Quay

WA / As Built

Elizabeth Quay will cover nearly 10 hectares of prime riverfront land in the heart of the city. The project will create a magnificent precinct featuring a 2.7 hectare inlet surrounded by a split level

Read More
  • Undergoing a Rating
  • Electricity Transmission & Distribution

EnergyConnect

NSW / As Built Design

Project EnergyConnect is a joint project between the Transmission Network Service Providers for NSW (Transgrid) and South Australia (SA) (ElectraNet) to join their state power grids via a new 330kV overhead transmission line interconnector between Robertstown (SA) and Wagga Wagga (NSW) substations, a total distance of approximately 900km. The NSW section of Project EnergyConnect covers

Read More
  • Certified
  • Water

Enlarged Cotter Dam

ACT / As Built

An Enlarged Cotter Dam is being built downstream of the existing dam to increase the Cotter Reservoir’s capacity from four gigalitres to 76 gigalitres. The Enlarged Cotter Dam forms part of

Read More
  • Certified
  • Road

Evans and Cardinia Road Level Crossing Removal Projects

VIC / Design

These two projects form part of the Victorian Governments Level Crossing Removal Project. Road over rail solutions to remove the current interface between road users and rail transport.

Read More
  • Registered
  • Rail

Faulconbridge & Lapstone Station

NSW / Design

About The Lapstone and Faulconbridge station upgrades (the Project) were completed as part of the Transport Access Program (TAP), a NSW Government initiative to provide a better experience for public transport customers by delivering modern, safe and accessible infrastructure.  The upgrades have made these station precincts accessible to people with a disability, limited mobility, parents/carers

Read More
  • Undergoing a Rating
  • Rail

Flinders Street Station Upgrade & Customer Experience Improvements

VIC /

The Flinders Street Station upgrade will include customer experience works to revamp/improve the station’s access and facilities, and refurbishment works to give renewed life to a key landmark

Read More
  • Undergoing a Rating
  • Rail

Forrestfield Airport Link

WA / As Built

The $1.86 billion Forrestfield-Airport Link is jointly funded by the Australian and Western Australian governments and will deliver a new rail service to the eastern suburbs of Perth – with three

Read More
  • Undergoing a Rating
  • Road

Gateway South (Darlington Upgrade Project)

SA /

This is a $620 million project jointly funded by Australian and State governments ($496 million federally funded and $124 million state funded). The Darlington Upgrade Project is another...

Read More
  • Certified
  • Road

Gateway Upgrade North

QLD / As Built

Description The Gateway Upgrade North was jointly funded by the national and state governments on a 80:20 split. This project was delivered by the Department of Transport and Main Roads with assistance from Trans urban Queensland under a Design & Construct contract with Lendlease Engineering Pty Limited. Its completion was announced on March 2019. The

Read More
  • Undergoing a Rating
  • Road

Gateway Upgrade North Project

QLD /

The Gateway Upgrade North project was jointly funded by the Australian Government ($914.18 million) and Queensland Government ($228.54 million) on an 80:20 split. Lendlease was...

Read More
  • Undergoing a Rating
  • Road

Gateway WA As Built

WA / As Built

This, the largest infrastructure project ever undertaken by Main Roads Western Australia, is a billion-dollar project involving a major upgrade to the road network surrounding Perth Airport, and...

Read More
  • Certified
  • Rail

Gold Coast Light Rail

QLD / As Built

The project relates to the development of a light rail system that passes through key activity centres of Southport, Surfers Paradise and Broadbeach. The 13-kilometre Stage One corridor and any

Read More
  • Certified
  • Rail

Gold Coast Light Rail – Stage 1

QLD / As Built

The project relates to the development of a light rail system that passes through key activity centres of Southport, Surfers Paradise and Broadbeach. The 13-kilometre Stage One corridor and any

Read More
  • Undergoing a Rating
  • Water

Googong Water Treatment Plant Chemical Facility Upgrade

NSW /

A new secure chemical unloading, bulk storage, handling and dosing facility shall be constructed to replace the existing systems which will be fully decommissioned and removed.

Read More
  • Certified
  • Road

Great Eastern Highway

WA / As Built

A 4.2km section of the Great Eastern Highway between Kooyong Road and Tonkin Highway widened from four to six lanes with a number of ancillary improvements including central medians,

Read More
  • Undergoing a Rating
  • Road

Great Northern Hwy

WA / As Built

The Great Northern Highway forms part of the National Land Transport Network linking the Perth Metro area and Fremantle Port with the North-West of Australia, as well as providing a link to

Read More
  • Undergoing a Rating
  • Road

Haughton River Floodplain Upgrade

QLD / As Built

Project Highlights Materials The project achieved a Level 3 score of (7.65/7.65 points)  for this credit 39% reduction is environmental impact.   The materials calculator estimates that that the environmental impact of the actual case is 39% lower than the base case. This reduction is due to the actual case having nine fewer bridges than the

Read More
  • Registered
  • Road

Healesville Koo Wee Rup Road South Upgrade Project

VIC / V 1.2 As Built

Overview The Healesville-Koo Wee Rup Road Upgrade Project involves the duplication of 10km of Healesville-Koo Wee Rup (HKWR) Road between Manks Road and Princes Freeway East (Princes Freeway). The Project is being delivered in two packages as separate projects: the HKWR Rd Upgrade (North Section) Project and the HKWR Rd Upgrade (South Section) Project. HKWR

Read More
  • Undergoing a Rating
  • Rail

High Capacity Metro Trains (HCMT)

VIC / As Built

Melbourne’s bigger, better trains will initially run on the Cranbourne and Pakenham lines and will eventually run through the Metro Tunnel to Sunbury. High-capacity signaling will allow the fleet

Read More
  • Undergoing a Rating
  • Road

Hills M2 Motorway

NSW / Operation

The Hills M2 Motorway is a 21-kilometre road linking Sydney’s lower north shore and the northwest regions. The M2 Motorway connects with Westlink M7, the Lane Cove Tunnel, and the NorthConnex tunnel. The motorway was first opened in 1997, with a widening and upgrade completed in 2013. Transurban took over operational control the M2 Motorway

Read More
  • Certified
  • Rail

Inland Rail – Narrabri To North Star Phase 1 project

NSW /

Inland Rail is a once-in-a-generation project that will enhance supply chains and complete the backbone of the national freight network between Melbourne and Brisbane via regional Victoria,

Read More
  • Certified
  • Rail

Inland Rail – Parkes to Narromine

NSW / As Built

The Parkes to Narromine section of Inland Rail in New South Wales was commissioned in late September 2020 and is now operational. The project involved the upgrade of 98.4km of existing rail track, including a full rebuild of the rail tracks, rail formation and supporting structures along the rail corridor. The 5.3km stretch of new

Read More
  • Undergoing a Rating
  • Road

Ipswich Motorway Upgrade (Rocklea to Darra) Stage 1, Package 1

QLD / Design

Rocklea to Darra - Stage 1 is the 3km upgrade of the Ipswich Motorway between Granard Road, Rocklea and Oxley Road, Oxley.

Read More
  • Certified
  • Road

Ipswich Motorway Upgrade Rocklea to Darra

QLD / As Built

Description Rocklea to Darra -Stage 1 is the 3km upgrade of the Ipswich Motorway between Granard Road, Rocklea and Oxley Road, Oxley. Key elements of the upgrade include: Upgrading the motorway from 4 to 6 lanes Higher bridges over Oxley Creek, including 7 new bridges New southern service road connection from Rocklea industrial precinct to

Read More
  • Undergoing a Rating
  • Cycleways and footpaths Roads

John Gorton Drive and Molonglo River Bridge Project

ACT / As Built Design

• 1.7 km of dual carriageway arterial road • 2 signalised intersections • 3 span, 227m dual carriageway bridge with ability to accommodate light rail in the future • Weathering steel box girders with a concrete deck • Steel encased concrete piers with piled abutments • Includes shared path access into adjacent development and river

Read More
  • Undergoing a Rating
  • Cycleway/Footpath

Kangaroo Point Green Bridge

QLD / As Built Design

Brisbane City Council is building new green bridges across Brisbane, including the Kangaroo Point Green Bridge. This will ensure Brisbane continues to be a great place to live, work and relax, and will provide the perfect way for residents to explore our river city during the Brisbane 2032 Olympic and Paralympic Games, leaving a lasting

Read More
  • Railways Roads

Keon Parade Level Crossing Removal Project

VIC / As Built

The Project will remove the current Keon Parade level crossing by building a rail bridge over the road and building a brand-new Keon Park Station with modern facilities for passengers. Elevating the rail line over Keon Parade will improve safety and reduce congestion for more than 18,000 vehicles travelling through the level crossing each weekday,

Read More
  • Certified
  • Road

Lathams Road Upgrade Project – As Built

VIC / As Built

Certified Score: 66.6 Certified Award Level: Excellent Project Description: The Lathams Road Upgrade Project involved the duplication and widening of Lathams Road from two lanes to four lanes between Oliphant Way and Frankston-Dandenong Road, including a new bridge over the Mornington Peninsula Freeway and widening and tie-in to the EastLink entry and exit ramps to

Read More
  • Certified
  • Road

Lathams Road Upgrade Project – Design

VIC / Design

Overview The Lathams Road Upgrade Project involved the duplication and widening of Lathams Road from two lanes to four lanes between Oliphant Way and Frankston-Dandenong Road, including a new bridge over the Mornington Peninsula Freeway and widening and tie-in to the EastLink entry and exit ramps to Oliphant Way. The length of carriageway upgraded is