Review all the most progressive assets and projects registered and certified with the ISC for an IS Rating. If your asset or project is not listed below, please speak to your IS Project Manager or contact casemanager@iscouncil.org for more information.

  • Road

Leppington & Edmondson Park Commuter Car Parks

/

Rating Type: Car park Certification Date: 26th of May 2022 Practical Completion: Leppington: 18th Oct 2021, Edmondson Park South: 24th January 2022 State: NSW Suburb: Leppington, 2179 & Edmondson Park , 7147 Project Overview The Commuter Car Parks Program is an initiative of the NSW Government to increase the provision of parking at key locations

Read More
  • Certified
  • Rail

Level Cross Removal Project – NWPA – Skye, Camp, Frankston

VIC /

The North Western Program Alliance delivered the level crossing removals at Camp Road in Campbellfield and Skye Road in Frankston, as well as the construction of the new Frankston Station

Read More
  • Certified

Level Crossing Removal Project – Melton Highway

VIC /

The Melton Highway Level Crossing Removal Project involved the construction of a six-lane road bridge over the busy Sunbury/Bendigo rail line resulting in the removal of one of Victoria’s

Read More
  • Certified
  • Rail

Level Crossing Removal Project – Mernda Rail Extension

VIC /

The Mernda Rail Extension Project is changing how residents in Melbourne’s fast-growing northern suburbs travel to work, school and entertainment.

Read More
  • Certified
  • Rail

Level Crossing Removal Project – North Eastern Program Alliance – Hurstbridge Line Upgrade

VIC / Design

The North East Project Alliance (NEPA) was established to remove four level crossings. The alliance members are Laing O'Rourke, Fulton Hogan, Jacobs, Metro Trains Melbourne and the Level Crossing Removal Authority (LXRA).

Read More
  • Undergoing a Rating
  • Rail

Level Crossing Removal Project – Package 4 – Caulfield to Dandenong

VIC / Design

The Cranbourne - Packenham line is the busiest rail line in Melbourne. At morning peak, boom gates are down for up to 82 minutes.

Read More
  • Certified
  • Rail

Level Crossing Removal Project – Western Program Alliance – Kororoit Creek and Abbotts Road

VIC / As Built

Kororoit Creek Road is used by 22,000 vehicles each day and is part of VicRoads’ Principal Freight Network. It is a key transport corridor that connects the Williamstown North industrial precinct,

Read More
  • Certified
  • Rail

Level Crossing Removal Project – North Western Project Alliance – Buckley Street

VIC / As Built

The Buckley Street Level Crossing Removal is part of the wider Level Crossing Removal Program (LXRP) of works. The level crossing was removed in 2018 by construction of a road underpass

Read More
  • Certified
  • Rail

Level Crossing Removal Project – Southern Program Alliance – Additional Works Package 1 – Cheltenham & Mentone

VIC / Design

Located on the Frankston line in Melbourne’s southeast, the project scope was to remove three level crossings in Cheltenham and Mentone and included: • Removal of level crossings at Park Road and Charman Road in Cheltenham, and Balcombe Road in Mentone, by redirecting trains into two rail trenches • Building new, modern stations at Cheltenham

Read More
  • Certified
  • Rail

Level Crossing Removal Project Package 1 – Burke, North, McKinnon, Centre

VIC / As Built

The Burke North McKinnon Centre (BNMC) level crossing removal projects were the first four of 50 level crossing removal projects to be delivered across the metropolitan Melbourne rail network.

Read More
  • Undergoing a Rating
  • Rail

Level Crossing Removal Project-North Western Program Alliance- Reservoir Station

VIC / As Built

The Reservoir level crossing at High Street will be removed and replaced with a rail over road solution including approximately 800 metres of twin elevated structures.

Read More
  • Road

Linkfield Road Interchange

QLD / Design

About The Linkfield Road Interchange is located in the northern suburbs of Brisbane within the Brisbane City Council Local Government Area. Linkfield Road Interchange is the southern most interchange located on Gympie Arterial Road (M3), with Strathpine Road Interchange (and the Bruce Highway) located to its north. Linkfield Road provides an important east-west arterial route

Read More
  • Certified
  • Road

Logan Enhancement Project

QLD / Design

The Logan Enhancement Project (LEP) involves widening sections of the Logan and Gateway Extension motorways, including improving key congestion congestion hot spots

Read More
  • Certified
  • Road

Logan Enhancement Project

QLD / As Built

Description The Logan Enhancement Project(LEP) involves widening sections of the Logan and Gateway Extension motorways, including improving key congestion hot spots and constructing new south-facing on and off-ramps on the Gateway Extension Motorway at Compton Road. LEP is made up of five components. It is an integrated transport solution that will unlock the economic potential

Read More
  • Undergoing a Rating
  • Water

Longwarry WRP

VIC / IS Essentials

Augmentation of the Longwarry Water Recycling Plant to meet significant predicted growth within railway corridor catchment area. South East Water believes there is significant opportunity to design and build a low emissions treatment facility that explore opportunities associated with circular economy initiatives for the local community, whilst improving effluent discharge quality and minimising risk to

Read More
  • Undergoing a Rating
  • Water

Lower South Creek Treatment Program

NSW / Design

Sydney Water’s LSCTP i is adopting several innovative process technologies which will be a first for Australia, deliver significant sustainability outcomes, and hopefully help pave the way

Read More
  • Certified
  • Water

Lower South Creek Treatment Program – St Marys and Quakers Hill WRPs

NSW / As Built

Rating Highlights Exceeding energy requirements The project exceeded the IS Rating requirements for Energy & Carbon Monitoring and Reduction & Use of Renewable Energy.  The Base Case footprint for energy and carbon reporting was calculated using a novel approach based upon the Water Services Association of Australia Wastewater Treatment Plant Energy Benchmarking Report. The project

Read More
  • Certified
  • Rail

LXRP – Package 2 – Blackburn Rd, Heatherdale Rd, Furlong Rd, Main Rd

VIC / As Built

This project by the CPB Contractors Pty Limited has achieved an 'Leading' As Built v1.2 IS Rating. The level crossing at Blackburn Road in Blackburn has been removed, with the rail line now lowered under Blackburn Road.

Read More
  • Undergoing a Rating
  • Road

LXRP MRPA – Clyde Road, Berwick

VIC / Design

The Clyde road level crossing removal project is on the Pakeham rail line adjacent to Berwick station. Road under rail solution to remove the current interface between road users and rail

Read More
  • Certified
  • Rail

LXRP SEPA Toorak Road

VIC / Design

Rating Highlights People and Place The project achieved a level 3 score of its Hea-1 design submission. In response to three raised priority issue; community connectiveness, skills development and social procurement. Several measures have been incorporated into the design phase of the project. Some of which include: Travelling in the Shoes of Others Workshop, an

Read More
  • Certified
  • Rail

LXRP SPA – Initial Works Package (IWP)

VIC / As Built

Overview The project scope included: Removing four level crossings in Carrum and Seaford Building a new elevated Carrum Station Constructing a road bridge connecting Station Street across Patterson River Constructing the new Kananook Train Storage Facility in Seaford Opening new community spaces and shared-use paths Rating Highlights Aboriginal co-design process Indigenous urban marker at Patterson

Read More
  • Certified
  • Rail

LXRP WPA – Aviation Road & Wyndham Vale Stabling

VIC / As Built

The Level Crossing Removal Project (LXRP) was established by the Victorian Government to oversee one of the largest rail infrastructure projects in the state's history. LXRP is part of the Major Transport Infrastructure Authority and our projects fall under Victoria’s Big Build. Central to the project is the elimination of 75 level crossings across metropolitan Melbourne by 2025, in addition to other rail network upgrades such as new train stations, track duplication and train stabling yards.

Read More
  • Roads Sewerage and Drainage

M1 Pacific Highway extension to Raymond Terrace, Heatherbrae Bypass

NSW / As Built Design

5km dual carraigeway road to be constructed in greenfields environment, drainage, utilities.

Read More
  • Undergoing a Rating
  • Road

M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun

QLD / As Built

J202 – M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun  Package Number  J323  J324  J325  Package Name  M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh  M1 Pacific Motorway Upgrade Palm Beach to Tugun  M1 Pacific Motorway Upgrade Burleigh to Palm Beach  Capex ($m)  96.8  270.2  208.2  Certified Score  81.62  79.11  81.74  Overall Weighted Average  80.49   

Read More
  • Certified
  • Road

M1 Pacific Motorway Upgrade Burleigh to Palm Beach

QLD / Design

J202 – M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun  Package Number  J323  J324  J325  Package Name  M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh  M1 Pacific Motorway Upgrade Palm Beach to Tugun  M1 Pacific Motorway Upgrade Burleigh to Palm Beach  Capex ($m)  96.8  270.2  208.2  Certified Score  81.62  79.11  81.74  Overall Weighted Average  80.49 

Read More
  • Undergoing a Rating
  • Road

M1 Pacific Motorway Upgrade Burleigh to Palm Beach

QLD / As Built

Project Highlights Urban Design – Urb-1  The project achieved a level 3 score of 4.69 for this credit.   Key initiatives that led to this score included:     Preparation of a VL2T Landscape and Urban Design Strategy (at the Program level to ensure consistency) and development of a package-specific Urban Design Plan (which responded to the overarching Strategy)   Conducted internal reviews on urban and

Read More
  • Undergoing a Rating
  • Road

M1 Pacific Motorway Upgrade Palm Beach to Tugun

QLD / As Built

Rating Highlights  Category  Credits  Achievements/Risks  Energy and Carbon  Ene-1  This project achieved a level 2.43 and a verified score of 8.94.  This project achieved this using 3 renewable technologies. These include:   Biofuel Consumption  Wind Farm  Solar Photovoltaic (PV) arrays  Due to the use of these renewable technologies, it has allowed there to be an increase

Read More
  • Road

M1 Pacific Motorway Upgrade Palm Beach to Tugun

/ Design

Project Highlights Energy and Carbon – Ene-1  This project achieved a level 2.43 and a verified score of 8.94. This project achieved this using 3 renewable technologies. These include:   Biofuel Consumption  Wind Farm  Solar Photovoltaic (PV) arrays  Due to the use of these renewable technologies, it has allowed there to be an increase of 179369 GJ

Read More
  • Undergoing a Rating
  • Road

M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh

QLD / As Built

Rating Highlights  Category  Credits  Achievements/Risks  Materials  Mat-1  The project achieved a level 3 score of 7.24 points for this credit.   The Project achieved a 33% reduction in materials use impacts for VL2B-BIC, compared to the base case footprint. Key initiatives that led to this reduction included:  Retaining the existing Reedy Creek Flyover, overall reduction of earthworks. Contributing 11% of the overall

Read More
  • Road

M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh

QLD / Design

Project Highlights Materials – Mat-1 The project achieved a level 3 score of 7.24 points for this credit. The Project achieved a 33% reduction in materials use impacts for VL2B-BIC, compared to the base case footprint. Key initiatives that led to this reduction included:  Retaining the existing Reedy Creek Flyover, overall reduction of earthworks. Contributing

Read More