Port Drive Upgrade
QLD / As Built
Port of Brisbane Pty Ltd (PBPL) is responsible, through a Road Franchise Agreement with the Department of Main Roads (TMR), for the maintenance and upgrade of Port Drive at Port Gate...
Read MoreReview all the most progressive assets and projects registered and certified with the ISC for an IS Rating. If your asset or project is not listed below, please speak to your IS Project Manager or contact casemanager@iscouncil.org for more information.
Port of Brisbane Pty Ltd (PBPL) is responsible, through a Road Franchise Agreement with the Department of Main Roads (TMR), for the maintenance and upgrade of Port Drive at Port Gate...
Read MoreThe project relates to the development of the reclamation area in Rous Head and comprises partitioning into lots, construction of the access roads, and the various services to the boundaries of the...
Read MoreThe $1.1 billion Rail Systems Alliance is being delivered by a consortium comprising CPB Contractors, Bombardier Transportation and Metro Trains Melbourne. It has registered for a Design v1.2 IS Rating.
Read MoreProject Highlights Energy and Carbon – Credit Ene – 1 This project has achieved a Verified Level 3 with a Verified Score of 11.36. They have achieved a reduction of 32.9 % The initiatives used within this credit include: A reduction in vegetation Clearing of 248,000 m2 Change of lighting from HPS to LED Reduction
Read MoreThe State road network in South Australia is one of the state’s biggest infrastructure assets and covers approximately 25% of the state’s total road network. The network consists of over 13,000km of sealed roads and 10,000km of unsealed roads, tunnels, bridges, traffic signals, signage, verge and drainage. DM Roads are responsible for maintaining Zones 1 (metro) and 3 (North) of the network and deliver a combination of Base Service, Minor Works, Annual Renewal Works and Minor capital works.
Read MoreThe South Gippsland Highway level crossing impedes the flow of 31,000 cars and trucks each weekday, with boom gates down for a third of the two-hour morning peak. The Victorian Government announced the removal of this crossing in November 2018 as one of 25 additional new crossings to be removed. The final design solution was
Read MoreDescription The South Gippsland Highway level crossing impedes the flow of 31,000 cars and trucks each weekday, with boom gates down for a third of the two-hour morning peak. The Victorian Government announced the removal of this crossing in November 2018 as one of 25 additional new crossings to be removed. The final design solution
Read MoreDescription The Stockinbingal to Parkes section of the Inland Rail alignment is an enhancement project modifying specific sites along 170km of existing rail in regional New South Wales. The works planned to be completed as part of this project are: – Increasing vertical clearance under the Wyndham Avenue road bridge in Forbes; and – Building
Read MoreThe $8.3 billion Sydney Metro Northwest is Australia’s biggest public transport project and a priority infrastructure investment for the NSW Government. It is the first stage of Sydney Rapid...
Read MoreThe Sydney Metro West, Eastern Tunnelling Package (ETP) involves the delivery of: Enabling works such as demolition, utility supply to construction sites, utility adjustments and modifications to the existing transport network Mined crossover cavern construction east of The Bays Station 4.2km of TBM Tunnel excavation, 650m of mined tunnels and 7 cross
Read MoreKey benefits include: New footbridge and stairs with canopies Three new lifts to provide accessible cross corridor and platform access Construction of new kiss and ride zones, accessible parking spaces and bus zones on Berkeley Road (east and west) including seating and improved access paths Upgrade of station entrances with new pavements, pathways and landscaping
Read MoreProject Description The project is part of the NSW Government’s the Transport Access Program, which aims to provide a better experience for public transport customers by delivering accessible, modern, secure and integrated transport infrastructure. Under the TAP program, five train stations were upgraded to provide accessible access to people with a disability, limited mobility, parents/carers
Read MoreTe Kori Scott Point is a 16.4ha area of land in the northwest of Auckland that is about to be transformed from a rural landscape to a public park to meet the needs of a new community.
Read MoreProject Description The Hawkesbury River and Warrawee upgrade works (the Project) were completed as part of the Transport Access Program (TAP), a NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state. Providing accessible transport services for everyone in the community is one of the six priorities for Transport for NSW’s
Read MoreOverview The Metro Tunnel will untangle the City Loop by taking three of the Melbourne’s busiest train lines through a new tunnel under the city, creating space on the network for more than half a million peak passengers every week. The project will create a new end-to-end rail line from Sunbury in the west to
Read MoreThe existing wastewater treatment plant is located south east of the Murray Bridge township and adjacent to the River Murray and was constructed in 1970. Since this time Murray Bridge has...
Read MoreConstruction and operation of about eight kilometres of new road between Mersey Road and just south of the existing Elizabeth Drive, Luddenham, to realign the section of The Northern Road...
Read MoreThis project by Level Crossing Removal Authority has achieved an ‘Excellent’ As Built IS Rating. Overview The Toorak Road, Kooyong level crossing was removed in April 2020, with trains now traveling on the new rail bridge. The level crossing was removed 6 months ahead of schedule, following major works starting in September 2019. The removal of
Read MoreDescription: The Townsville Ring Road Stage 5 (TRR5) project will deliver improved road safety, efficiency and travel time reliability for freight and passenger vehicles on the Bruce Highway in Townsville. The project forms part of a larger 36-kilometre section of highway known locally as the Ring Road with the TRR5 project being the final component
Read MoreProject Description The Bexley North and Petersham station upgrade projects included a range of works to improve accessibility, security and amenity for public transport users. The two stations were upgraded as part of the TfNSW TAP3 program which aims to provide universal access and compliance with disability legislation. The scope of works included utilities works
Read MoreProject Description The Como Station Upgrade Project (the Project) is part of the third tranche of Transport for NSW’s (TfNSW) Transport Access Program, known as TAP 3 and seeks to improve access to public transport for people with disability or limited mobility, parents and careers with prams, and customers with luggage. Providing accessible transport services
Read MoreKey Benefits: East Hills Station 2 new lifts connecting from the underpass to the station platforms upgrade of the station entrance on Park Road to provide improved pathways for customers upgrade of the two existing accessible parking spaces in the commuter car park a new kiss and ride area on Park Road upgrade of the
Read MoreOverview The Hawkesbury River and Warrawee Stations Upgrades are part of the third tranche of Transport for NSW’s Transport Access Program, known as TAP 3 and seeks to improve access to public transport for those with disability, those with limited mobility or parents with prams and customers with luggage (TAP 3 | Transport for NSW).
Read MoreProject Description The Lapstone and Faulconbridge station upgrades (the Project) were completed as part of the Transport Access Program (TAP), a NSW Government initiative to provide a better experience for public transport customers by delivering modern, safe and accessible infrastructure. The upgrades has made these station precincts accessible to people with a disability, limited mobility,
Read MoreKey benefits: Fairy Meadow Station two new lifts; a new family accessible toilet on each platform; upgraded CCTV and lighting for improved safety and security; upgraded footpaths between the car park and station; a new kiss and ride space; a new Boarding Assistance Zones and hearing loops to both platforms; removal of existing track level
Read MoreKey benefits include: Provision of a new paved forecourt area around the station building entry; 2 new lifts connecting each platform to the commuter car parks; New ramp from Kurrawa Avenue Commuter Car Park to connect to the new lift; New stairs from Kurrawa Avenue entry to the station underpass; 2 new accessible parking spaces
Read MoreKey benefits Pymble 3 new lifts to connect Pacific Highway, Grandview Street and the station platforms to the existing footbridge A new forecourt on the Pacific Highway side, connecting the existing footpath and bus stop to the new lift Improvements to accessible parking spaces near the Pacific Highway lift entrance Improvements to amenities including a
Read MoreProject Description The Redfern Station upgrade works (the Project) were completed as part of the Transport Access Program (TAP), a NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state. Providing accessible transport services for everyone in the community is one of the six priorities for Transport for NSW’s Future Transport
Read MoreProject Description The Rooty Hill Station upgrade and new 750 space, six storey Commuter Carpark opened in January 2020 has delivered significant community and environmental benefits through sustainable design. This project has left a legacy of community connectivity, responding to the challenge of climate change, while celebrating rich local heritage. The Project represents a turning
Read MoreKey benefits include: A new footbridge over the rail corridor connecting the platforms of Towradgi Station Two new lifts which will have three stops including platform level, road/pedestrian level and footbridge level. Lift landings will also have weather protection canopies in the waiting areas New footpaths to connect Towradgi Road and Weber Crescent to the
Read MorePlease provide us with any feedback on the IS Rating Scheme