Glen Huntly Level Crossing Removal Project – SPA AWP4 - ISCouncil

Glen Huntly Level Crossing Removal Project – SPA AWP4

Project Details

  • Rating Type: As Built
  • Location: VIC
  • Rating Level: Leading
  • Rating Score: 81.77
  • Assessor Name: Simon Renton
  • IS Project manager: Randini Dissanayake
  • Stakeholders: Southern Program Alliance - Acciona, WSP, MTM, and LXRP ,WSP ,Acciona ,Metro Trains Melbourne

Description

The project scope includes: 

  • Removing two level crossings at Glen Huntly Road and Neerim Road and adopting a rail under solution for the surrounding station and rail infrastructure. 
  • Building a new, modern Glen Huntly station. 
  • Removing one rail/tram square and integrating new tram infrastructure in its place 

Acknowledgments:

People: Nathan Lord, Justin Lewis, Matthew Muru, Theo Mimoun 

Suppliers: Hanson, Upparel, Ampol, ODM Electrical 

Testimonial: 

“The team is very proud to have achieved a leading rating for 

Glen Huntly. This reflects the great Project outcomes, which 

include a feature station, improved connections for the 

community, and a reduced carbon build.” Hala Nader (Sustainability Advisor – Southern Program Alliance)  

Rating Highlights 

Category  Credits  Achievements  Risks 
Energy  Ene-1  Installation of a 60 kW solar panel array  N/A 
Water  Wat-2  A 20 kL rainwater tank installed at the new station.  N/A 
Materials  Mat-1  40% cement replacement mixes used for in-situ concrete across the project, including additional trials such as a 70% SCM mix used in the new pocket park by Neerim Road.  N/A 
Heritage  Her-1 
  • Glen Huntly bell is a symbolic relic which was removed during the project and restored and has now been reinstalled close to its original location. 
  • 15 Canary Island Date Palms along Royal Avenue that are up to 100 years old were relocated during the works, and returned to site and replanted after the completion of works. 
  • Two artist designed neon sculptures honouring the local environment and surrounding architecture were installed within the new station forecourt. 
N/A 
Procurement  Pro-4  Installation of green-powered EV charging station at the site compound and use of an electric vehicle.  N/A 

Verified Innovations  

Name   Verification Date  Innovation Type  Description 
Enviro Pad  13/12/24  Innovative Technology or Process 

Victoria First 

The EnviroPad is a unique smart spill pad that captures and solidifies hydrocarbon  spills including oils, fuels and hydraulic fluids. 
Polybins  13/12/24  Innovative Technology or Process 

Victoria First  

Polyrok adopts the use of the recycling soft plastics and other plastic’s by placing ‘smart’ bins at sites offices and/or general areas. The waste collected in the bins is used in aggregate production. 
100% High vis 

recycling 

13/12/24  Innovative Technology or Process 

Australian First (awarded under 12 month ruling) 

SPA have partnered with Assembled Threads to test their 100% recycled Hi-vis vests. 
ISupply  13/12/24  Innovation Challenge (IC-8)  Infrabuild reinforcing bar and mesh, Hanson concrete, Holcim ready-mix concrete. 
Upparel  13/12/24  Market Transformation    SPA have partnered with UPPAREL to recycle staff PPE and workwear. 
Foreign Object 

Debris System 

(FODS) 

13/12/24  Innovative Technology or Process 

Australian First (awarded under 12 month ruling) 

A mat which picks up truck dirt before moving off site. 

 Certification Date:

17/12/2024

 