Located on the Frankston line in Melbourne’s southeast, the project scope was to remove three level crossings in Cheltenham and Mentone and included:
• Removal of level crossings at Park Road and Charman Road in Cheltenham, and Balcombe Road in Mentone, by redirecting trains into two rail trenches
• Building new, modern stations at Cheltenham and Mentone
• Upgrading the surrounding station precincts, including a Mentone Station Heritage Deck and Gardens; multilevel carpark in Cheltenham; and a 3.5 kilometre shared-use path between Cheltenham and Mentone.