The Sydney Metro – Western Sydney Airport, Station Boxes and Tunnelling Works (SBT) forms part of the broader Sydney Metro network.
The SBT scope includes:
- The design and construction of two sections of twin tunnels with a combined length of approximately 9.8 kilometres
- Associated portal structures, station boxes, services shafts, temporary ground support, cross passages, and stub tunnels.
Rating Highlights
| Category | Credits | Achievements |
| Energy and Carbon | Ene-1 | The Project achieved a verified level of 3 with a score of 13.09.
The Project demonstrated a commitment to offset 100% of Scope 1 and 2 emissions in construction. Additionally, the purchase and retirement of 43,812 ACCUs demonstrate a 36% reduction in overall GHG emissions. Through procurement of Hybrid vehicles, the project observed 33% reduction in Fuel consumption. Procurement of EPB TBMs with Continuous Mode Earth Pressure Balance reduced ring – building cycle time by 26%, accelerating tunnelling activities. |
| Climate Change Adaptation | Cli-1/Cli-2 | The Project achieved a verified level of 3
The SBT Works adaption measures reduced all climate change risks to at least a low-risk rating. SBT has no extreme and/or high priority climate change risks. Some of the noteworthy initiatives:
|
Verified Innovations
| Name | Verification Date | Innovation Type | Description |
| Inn-1.01 – Glass fibre reinforced rock bolts | 27/02/2024 | Innovative Technology or Process – State First (NSW) awarded as piggyback | The Project received 1point for a State First innovation as piggyback on another project previously verified.
Glass-fibre-reinforced rock bolts reduce life cycle assessment-based (LCA) emissions by up to 40% compared to traditional steel rock bolts. |
| Inn-1.12 – GuardDog drain filters | 27/02/2024 | Innovative Technology or Process
Australian First (awarded as piggyback) |
The Project received 3 points for an Australia First innovation awarded as piggyback on a project previously verified.
Stratex’s GuardDog drain filter is made of recycled materials and used to trap sediment and hydrocarbons from entering stormwater drains. It is more durable than traditional erosion and sediment control products and is effective even in high flow situations. |
| Inn-1.08 – Contamination management | 27/02/2024 | Innovative Technology or Process
State First (NSW) |
The Project received 1 point for a State First (NSW) innovation.
Activated carbon injected into the ground to create a permeable reactive barrier to prevent chlorinated hydrocarbons from migrating towards the St Marys station box asset. |