Project Details

  • Project Owner: Perth Airport Pty Ltd
  • Rating Type: Design IS Essentials
  • Location: WA
  • Rating Level: Bronze
  • Rating Score: 27.1
  • Assessor Name: Nikita Worthington
  • IS Project manager: Ben Wade
  • Stakeholders: Perth Airport Pty Ltd, GHD Pty Ltd ,West Coast Civil

Description

Perth Airport has embarked on a multi-billion-dollar investment program to deliver additional capacity to cater for its growing passenger base.

The program of works will transform Perth Airport and will deliver the long held vision to consolidate all commercial air services into one Central Airport Precinct.

The Airport Central precinct will ultimately provide numerous benefits, including but not limited to:

  • Increased operational efficiency and productivity
  • Reduction in operational costs and increased revenue
  • A more enjoyable and seamless passenger experience for WA residents, interstate and international visitors

A critical aspect of this consolidation is the development of a dedicated Aviation Support Precinct (ASP). It will be an area that caters for important support services such as in-flight catering, maintenance, ground service equipment maintenance and freight facilities.

The Scope of this Project includes:

  • The T2 Remote Apron Expansion (T2 Apron) to deliver additional apron parking capacity within the Airport Central precinct to cater for an increase in demand from regional and resource-based charter operations.
  • A new gatehouse and associated road network, fencing, gates, and traffic airlocks replacing the existing Gatehouse 1 building.

ASP located within the area of the Airport known as Airport Central, to accommodate existing and new aviation support services for Perth Airport’s ongoing operations.

Functions will include aircraft maintenance, GSE maintenance, in-flight catering and air freight facilities.

Acknowledgements:

  • Robbie Sorrell - Senior Design Manager
  • Dhaval Gajera - Sustainability Project Advisor
  • Nick Hawley – Consultant Project Manager
  • Nina Truong - Assistant Consultant Project Manager
  • Nikita Worthington – Sustainability Consultant
  • Viola Patriarchi – Sustainability Consultant

Rating Highlights

Category Credits Achievements
Options Assessment Ecn-1 A decision-making framework has been developed for the project, establishing significance thresholds and processes to assess both major and minor decisions throughout the project's lifecycle. A multi-criteria assessment (MCA) combined with a Rapid Cost Benefit Analysis has been used to evaluate significant decisions, including:

·       Reusing existing surplus fill on the estate to minimise imported materials from offsite

·       Reducing pavement wearing course thickness from 120mm to 60mm to reduce material required over a large area of pavement

·       Retaining the lower pavement of T2 to minimise demolition and construction energy use and materials

Adopting recycled crumbed rubber for blast pavements in place of virgin asphalt materials.

Energy Ene-1 & Ene-2 The project's energy use and carbon emissions have been modelled for both the construction and operation phases. Calculations were conducted to determine the energy demand that could be substituted by renewable energy, with solar power being utilized for on-site facilities during construction. The modelling indicated a substitution over the asset's lifespan.

Additionally, opportunities to reduce energy use were identified and evaluated for feasibility. Those deemed feasible and capable of delivering significant reductions were assessed using the project's decision-making framework and quantified in the energy model. The implemented measures included:

·       Retaining the existing pavement structure and adding a base course and wearing course layer to minimise energy required for demolition of pavements

·       Reducing the pavement wearing course thickness to 60mm to minimise energy required for construction

Installing motion sensor lighting in the gatehouse to reduce operational energy use

Resilience Res-1 The project demonstrated a proactive approach to managing climate risks by reviewing past climate events and existing climate change models to identify potential risks to the project's resilience during its operational lifetime. A total of 23 risks related to material natural hazards were identified and assessed, including 5 indirect risks.

  • One impact is rated high over the long term (2090) but is currently low and will be reviewed as needed, given the project's 40-year lifetime.
  • Four risks are currently rated moderate.
  • Five risks are rated moderate for 2030 conditions.
  • Fifteen risks are rated moderate for 2090 conditions.
  • All remaining impacts are considered low or very low.
  • Mitigation measures for high and above risks have been identified and implemented in the project design where feasible.

 

Resource Efficiency Rso-1, Rso-4 & Rso-6 A Resource Efficiency Strategy (RES) has been developed for the project to consolidate efforts in reviewing existing practices and identifying new opportunities to maximize resource efficiency during construction. Various resource efficiency opportunities for inputs and outputs were identified and assessed for feasibility.
Water Wat-1 & Wat-2 The project developed a high-level strategy to address appropriate water sourcing, aiming to identify available and feasible water sources to minimize potential environmental impact. The formal assessment identified the following feasible water sources for the project:

  • Groundwater
  • Airport estate drains
  • Dewatering water

These options have a zero financial payback period, as they are construction opportunities with no ongoing costs beyond the construction phase. The adoption of using the Airport estate drains as a water source during construction, primarily for flooding compaction was modelled to minimise ground and potable water use.

 

 