LXRP – SPA – Kananook – AWP7

Project Details

  • Project Owner: SPA
  • Rating Type: Design
  • Location: VIC
  • Rating Level: Excellent
  • Rating Score: 55.61
  • Assessor Name: Simon Renton
  • IS Project manager: Randini Dissanayake
  • Stakeholders: Acciona, WSP, MTM, and LXRP ,WSP ,Acciona ,MTM

Description

The Additional Works Package 7 (AWP7) involves the construction of additional train storage capacity and the construction of a train maintenance facility, train wash facility and gatehouse. This now represents a fully built site and builds on the SPA initial works package. 

Acknowledgement

This project has achieved some great outcomes through the design verification process, and the team is looking to leverage this into the As-Built rating.

Simon Renton, Sustainability Manager - SPA

Rating Highlights 

Category  Credits  Achievements 
Energy  Ene-1  16% reduction in the required construction and operational energy. 
Energy  Ene-2  The installation of 99kW of rooftop solar. 
Water  Wat-1  The installation of 25 KL of operational water storage. 
Water   Wat-2  The installation of a train wash facility which reuses 85% of its water. 
Materials  Mat-1  The use of over 65% of recycled rail and sleepers on site.  

Verified Innovations  

Name   Verification Date  Innovation Type  Description 
Electric Piling Rig  18/06/2025  Innovative Technology or Process – Australian First  The first use in Australia of an Electric Piling Rig used in the construction of the piles for the train maintenance facility. 