Description
The Additional Works Package 6 (AWP6) involves the removal of 2 level crossings through a rail over scenario at Parkers Road Parkdale & Warrigal Road Mentone, and the construction of a new station at Parkdale.
Rating Highlights
| Category | Credits | Achievements |
| Energy | Ene-2 | 25% of construction and operational energy sourced through renewable sources. |
| Water | Wat-1 | 14% reduction in water use. |
| Ecology | Eco-1 | 79% enhancement in Ecological value. |
| Materials | Mat-1 | 13% reduction of greenhouse gas emissions from embodied carbon in materials |
| Stakeholder | Sta-3/4 | The community was communicated with effectively and their concerns were addressed |
Verified Innovations
| Name | Verification Date | Innovation Type | Description |
| Green Ceramic Tiles | 13/09/24 | Innovative Technology or Process.
Victoria First |
The use of Green tile Ceramics (Noveco Surfaces) within the station PSO and toilet areas. This product contains 80% recycled content. |
Acknowledgement
"This project has achieved some great outcomes through the design verification process, and the team is looking to leverage this into the As-Built rating."
Simon Renton, Sustainability Manager - SPA