Description
The Mandurah Estuary Bridge Duplication involves construction of a new bridge adjacent to the existing bridge on Mandurah Road, to remove the existing traffic bottleneck (i.e. northbound lane currently only accommodates one lane of traffic) and provide a continuous four-lane dual carriageway.
The new bridge will also include a shared path to improve connectivity. The project also includes the construction of a universally accessible recreational fishing platform to encourage fishing for all.
Rating Highlights
| Category | Credits | Achievements/Risks |
| Social | Leg-1 | Improving accessibility and sense of place in public areas:
Through the identification of legacy opportunities, the project team was able to introduce additional scope to construct a universally accessible fishing platform and ACROD parking bays at the base of the Mandurah Estuary Bridge.
There continues to be an ongoing shortage of universally accessible fishing platforms / areas (and associated facilities such as carparking and ACROD bays) within the Mandurah region for people with disability or mobility impairments. Existing fishing facilities are becoming increasingly overcrowded and are limited in space.
Additionally, the eastern foreshore on the Project currently provides no easy access to the public or those with mobility difficulties. The area is only accessible via a minor gravel footpath from Waterside Drive, with vehicle access limited to City of Mandurah maintenance personnel via a locked gate. The closest publicly accessible parking is via a small number of bays on the side of Waterside Drive (~100m from the foreshore).
Accessibility was raised as part of wider stakeholder workshops and as such, is reflected in the Project’s vision to be a connected, accessible, and high-quality bridge and fishing platform that delivers a positive legacy by embracing local culture, improving habitat and amenity, and enhancing sense of place. |
| Social
|
Sta-1, Sta-2 | Positive outcomes from early Stakeholder Engagement:
Early engagement gave stakeholders the opportunity to discuss the project directly with engineers. This gave them understanding of the impacts of the project (e.g. communicating the approval process) and the complexities of decision making. This was an important tool in managing stakeholder expectations and allowing stakeholders to understand the interests of other stakeholders and the level to which they will be able to influence the project. The sustainability process has also changed the way of working with environmental groups, as they are usually managed by the Environmental Branch of Main Roads. The early engagement helped the relationship by giving them context early on and bringing them along for the ride.
|