Mandurah Estuary Bridge Duplication

Project Details

  • Project Owner: Main Roads Western Australia
  • Rating Type: Planning V 2.1 Design and As Built
  • Registered Date: January 2023
  • Completion Date: December 2025
  • Location: WA
  • IS Project manager: Adam Dallas
  • Stakeholders: Main Roads Western Australia,Jacobs delivering Sustainability Planning Rating

This project is the construction of Bridge 1910 adjacent to the existing Bridge 1085 on Lakeland Lake Clifton Road (M074) to remove the existing bottleneck and provide a continuous 4-lane dual carriageway for road users crossing the Mandurah Estuary (with provision to be converted to a 6-lane dual carriageway in the future once required). The new bridge is to include a shared path to improve connectivity, and the project will include construction of a wheelchair accessible fishing platform to encourage fishing for all (the existing platform is only accessible via stairs from the centre of Bridge 1085).

Stay up to date!

Stay up to date with our latest publications and news.