Parramatta Light Rail Stage 1 – Supply, Operate & Maintain Contract - ISCouncil

Parramatta Light Rail Stage 1 – Supply, Operate & Maintain Contract

Project Details

  • Project Owner: Great River City Light Rail
  • Rating Type: Design
  • Location: NSW
  • Rating Level: Excellent
  • Rating Score: 70.16
  • Assessor Name: Thirukumaran Jallendran
  • IS Project manager: Asim Nizam
  • Stakeholders: Great River City Light Rail Pty Ltd, WSP, CAF Australia

Description

Parramatta Light Rail (PLR) is a dual-track, light rail project aimed at meeting the growing public transportation needs in the Greater Parramatta region. Stage 1 of the PLR project includes the construction and operation of a 12-kilometre light rail service from Westmead to Carlingford via Parramatta CBD and Camellia.

Acknowledgement:

People:

  • Alan Brittain
  • James Owen
  • Imtiaz Risha
  • Raju Divarkala
  • Paul Badra
  • TfNSW

Rating Highlights

Category Credits Achievements
Energy Ene-1 The Project achieved a verified level of 2.5

​An energy impact reduction of 22.43% through the implementation of Rooftop Photo Voltaic (Solar) System, use of external LED lighting, Light Rail Regenerative Braking and purchase of Carbon Offsets, during both construction and operation.

Water Wat-1 The Project achieved a verified level of 2.6

​A water use reduction of 17% through drought tolerant planting, passive irrigation and water recirculation within the fire system and the train wash system.

​Materials Mat-1 The Project achieved a verified level of 2.23

An 18% material use reduction through the use of recycled materials and reductions in pavement thickness and power cables.

 

 