Description
Queanbeyan-Palerang Regional Council (QPRC) is responsible for the management and operation of the Queanbeyan Sewage Treatment Plant (STP) that provides treatment to sewage from Queanbeyan prior to discharge into the Molonglo River approximately 9 km upstream of Lake Burley Griffin. QSTP is located approximately 15 km south-east of the Canberra central business district. The current STP has reached the limits of its capacity and at the end of its effective service life. This upgrade project will completely replace the existing STP with a new STP to cater for a population of 75,000 Equivalent Population (EP) in stage one with the potential to expand the capacity by an additional 50% in the future, to serve 112,500 EP.
Although the STP services the Queanbeyan area, it is located in the ACT and will therefore be regulated by both the NSW and ACT government authorities. It is anticipated that future expansion would service continued growth within the region of Queanbeyan.
The new STP has been designed to enable the following:
- Improved ability to control the water quality discharged to the environment and to protect public health
- Providing improved protection of the treatment plant against flooding and climate change sustainability
- Domestic sewage and septic tank waste treatment to meet water quality requirements
- Bio-solids treatment to facilitate beneficial reuse
- Onsite water recycling and a recycled water standpipe for water tanker filling
- Potential to expand capacity to allow for future growth
- Providing improved traffic access to the treatment plant by sealing the access road.
The new STP will provide an appropriate level of treatment and disposal of waste, helping to protect public health and the environment while remaining affordable to the community.
Rating Highlights
| Category | Credits | Achievements |
| Materials | Mat-1 | Biological phosphorus removal: The project includes construction of an anaerobic zone to allow for future full or partial biological phosphorus removal (i.e. 90%) with alum chemical trim to be used. This reduces chemical process requirements, reducing costs as well as reducing energy and carbon emissions associated with delivery of chemicals to the plant. |
| Materials
Energy |
Mat-1 &
Ene-1 |
Hydraulically mixed anaerobic zones: The project includes hydraulic mixers in place of mechanical mixers in the bioreactor anaerobic zones. To determine if hydraulic mixing could be used as an alternative method, a pilot plant test was undertaken. The test results affirmed that hydraulic mixing was suitable and therefore this was implemented in the design, eliminating the need for mechanical mixers, reducing the materials and operational energy requirements. |
| Energy | Ene-1 | Oxidation ditch with gravity clarifiers: The secondary treatment option selected for the design includes an oxidation ditch with gravity clarifiers instead of a membrane bioreactor option, requiring less energy and less chemicals to produce the same effluent quality. |
Verified Innovations
| Name | Verification Date | Innovation Type | Description |
| Improving on credit benchmarks
|
July 2026 | Improving on credit benchmarks
|
The QSTPU has achieved a water reduction of 78.48%, which is significantly above the Wat-1 level 3 achievement of 20%.
This reduction is attributed to the use of reticulated water from the treatment plant as a substitute for potable water for onsite treatment processes. |
| Innovation Challenge – IC-9 | July 2026 | IC – 9 Revised Lan-4 Pilot | The project pursued IC-9; the revised Lan-4 credit. The project achieved level 1 of the revised Lan-4 credit, with the aid of a technical clarification. Following this, feedback was provided to ISC through a feedback form. |
Acknowledgements
Suppliers:
- AECOM
- Arup Australia
- Beca Hunter H20
- Lyall & Associates
- RPS Australia East
Testimonial (Project Executive)
“Implementing the IS Rating into the design of the Queanbeyan STP Upgrade has challenged QPRC to explore and implement beneficial sustainability measures that would not have been considered otherwise.”
- Simon Boulton, QSTP Project Manager, Queanbeyan-Palerang Regional Council