Raising London Circuit (RLC) - ISCouncil

Raising London Circuit (RLC)

Project Details

  • Rating Type: Design
  • Location: ACT
  • Rating Level: Leading
  • Rating Score: 79.4
  • IS Project manager: Luke Sammut
  • Stakeholders: Major Projects Canberra, AECOM

Description

The Project involves creating an at-grade intersection between London Circuit, Edinburgh Avenue and Commonwealth Avenue, with provision of a new signalised intersection between London Circuit and Commonwealth Avenue. The Project is proposed as one of a series of major projects being planned and delivered in a coordinated and holistic way to give effect to the strategic planning and development vision in the NCP for Canberra City and its surrounds.

Rating Highlights

Category Credits Achievements/Risks
Energy and Carbon Ene-1 The Project achieved a verified level of 3 with a score of 10.33.

The Project’s emission factors are sourced from the most recent National Greenhouse Accounts Factors (except for purchased electricity) and energy use and emissions have been modelled according to industry standards and national legislation. The Project has also identified potential material Scope 3 emissions, however, assessments showed that these emissions only represent 0.4% of the total project emissions. The process of modelling the energy was managed and reviewed by suitably qualified professionals (SQPs) with over 6 and 13 years of experience.

The Project requires the contractor to monitor and track emissions sources to support the preparation of a GHG inventory report. Monitoring of energy use and GHG emissions will then be used to inform the actual case for the As-Built Rating.

Environmental Impacts Env-4 The Project achieved a verified level of 3 with a score of 3.64.

The Project has provided an Air Quality Assessment summary in the Environmental Assessment (EA). Since the Project involves common earthworks activities with no ongoing significant air pollution sources, it is not anticipated that air emissions will exceed air quality standards. Additionally, Project is not expected to generate additional traffic nor significantly affect the distribution of traffic during operation. The Project has developed a Construction Environmental Management Plan (CEMP) that includes air quality mitigation measures such as:

·       Planning the site layout appropriately

·       Taking weather conditions into consideration

·       Covering vehicle loads

·       Water assisted dust sweepers

·       Stockpile controls

·       Visual monitoring and recording observations

·       Implementing weekly monitoring via the contract & inspection schedule

Unmitigated air-quality-related health impacts were identified as low to medium for the project and, provided that all other recommended dust mitigation measures in the EA are applied, the risks from dust spoiling and health impacts are deemed “non-significant”.

Urban and Landscape Design Urb-1 The Project achieved a verified level of 3 with a score of 6.12.

The Light Rail Stage 2 Urban Design Framework (UDF) and Guidelines were developed to cover all of Light Rail Stage 2, including the Project. The UDF provides design principles to guide the achievement of consistent, high-quality public realm design throughout the light rail project. This also ensures the Project is aligned with the ACT Government’s vision for “ensuring Canberra is one of the world’s most liveable and competitive cities connected through smart public transport”.

The corridor strategy section in the UDF also provides site planning across the 9 ‘character areas’ along the Project corridor. For each character area, an urban design response concept plan is provided together with key design drivers (or features). The design principles are organised around 4 design themes and further broken down into sub-themes: movement, place, sustainability and delivery. An independent design review was undertaken prior to the preliminary and final sketch plan and the urban and landscape design plan has been updated based on the National Capital Design Review Panel (NCDRP) panel advice and proponent response.

 

Verified Innovations

Name Innovation Type Description / Sustainability Benefits
OPC Reduction Market Transformation

 

The Project received 1 point for this Innovation.

The Project team has developed a specification that sets a reduction target for the use of ordinary Portland cement (OPC) by 40% across the Project. This reduction target is adopted in the design through a contractual specification which requires compliance with the target when construction commences. The reduction target is also included in performance specification which allows each project initiative to be quantitatively assessed.

This market transformation is shown by suppliers developing low-OPC concrete mixes as they have become increasingly in demand. Therefore, this paves the way for more recycled concrete to be used on other major projects.

Passive Street Tree Irrigation Innovative Technology or Process

Territory First

The Project received 1 point for this Innovation.

By increasing stormwater capacity and storage while supporting passive tree irrigation, this innovation addresses the following environmental and economic concerns:

·       Improving water quality by diverting stormwater run-off

·       Avoiding subterranean erosion in street pits

·       Mitigating flooding impacts

·       Avoiding large irrigation water use costs with modelling for irrigation savings estimates a total ~2,581kL water savings for the 2-year establishment period

This innovation has been adopted in the Final Sketch Plan (FSP) Landscape Drawings and will be implemented by the contractor once construction commences. The design will also be detailed as a major erosion and sedimentation control measure in the Soil and Water Management Plan (SWMP), developed as a part of the CEMP.

Revizto Digital Engineering for Tree Location Innovative Technology or Process

Territory First

The Project received 1 point for this Innovation.

The Project has identified the need for more innovative digital functionality. This has led to the use of 3D planning tools and models (accessed via a tablet) to undertake options analysis and demonstrate designs to stakeholders. The Revizto model was used to address environmental concerns such as tree placement and soil volume needs by allowing for sustainable designs to be prioritized over traditional designs in utility placement. Therefore, using this innovation in the design phase ensures that sustainable outcomes are embedded into the final works and is at the forefront of the landscape design strategy.

Piloting updated Env credits Innovation Challenge 1 The Project received 2 points for this Innovation (0.4 points for each credit).

The Project is piloting the v2.0 Env-1, Env-2, Env-3, Env-4 and Env-5 credits, replacing the v1.2 Dis-1, Dis-2, Dis-3, Dis-4 and Dis-5 credits as per the Innovation Challenge Appendix.

 