Search Results for: -水疗会所外围(高级资源).tug
WestConnex M4-M5 Link Tunnels Project – Governance Outcomes
Describe WHAT you have done and HOW you have done it. Governance and leadership played a pivotal role in the design and delivery of the M4-M5 Link Tunnels (the Project) delivered by the ACCIONA, Samsung and Bouygues Construction Australia Joint Venture (ASBJV) in partnership with Transurban and Transport for NSW. The Project commenced in 2018 and opened to traffic
Read MorePreston Level Crossing Removal Project – Governance Outcomes
Describe WHAT you have done and HOW you have done it. Victoria’s landmark Level Crossing Removal Project (LXRP) is removing 110 dangerous level crossings across Melbourne. In 2022, the North Western Program Alliance (NWPA) completed the Preston Level Crossing Removal Project (‘the Project’); a complex rail infrastructure upgrade that included the removal of four level crossings, construction of two
Read MoreTonkin Gap Project and Associated Works – Governance Outcomes
Describe WHAT you have done and HOW you have done it. The Tonkin Gap Alliance (TGA) comprised of Main Roads, Public Transport Authority (PTA), Georgiou, BMD, WA Limestone, BG&E and GHD, is upgrading Tonkin Highway in Western Australia with additional lanes, new interchanges, bridges and a shared path, as well as delivering enabling works for METRONET’s Morley-Ellenbrook Line. We
Read MoreWestern Harbour Tunnel Southern Tunnel Works – Environmental Outcomes
Describe WHAT you have done and HOW you have done it. In 2018, the John Holland CPB Contractors Joint Venture (JHCPB) was contracted by Transport for New South Wales (TfNSW) to deliver the Rozelle Interchange (RI). The Project scope included construction of an underground tunnel motorway interchange, including enabling works for the future Western Harbour Tunnel (WHT). In late
Read MoreTransurban/Ventia Hills M2 Ops – Environmental Outcomes
Describe WHAT you have done and HOW you have done it. Transurban and Ventia embarked on a collaborative sustainability initiative to achieve environmental outcomes at the Hills M2 Motorway. Through innovative solutions and best practices, they aimed to reduce greenhouse gas emissions, divert waste from landfill, and enhance biodiversity. To reduce greenhouse gas emissions, Transurban and Ventia took a
Read MoreForrestfield-Airport Link – Environmental Outcomes
Describe WHAT you have done and HOW you have done it. Now known as the Airport Line, the METRONET Forrestfield-Airport Link included two 8km tunnels, three new stations and a total 16km of rail infrastructure. From 2016, the Public Transport Authority and Webuild-NRW JV worked collaboratively to achieve a minimum Infrastructure Sustainability (IS) Excellent Design Rating and Leading As-Built
Read MoreM12 West – Environmental Outcomes
Describe WHAT you have done and HOW you have done it. The M12 West package (M12W), between The Northern Road, Luddenham and approximately 250 metres east of Badgerys Creek, is part of the M12 Motorway, a key part of the Western Sydney Infrastructure Plan. The M12W project consists of a four-lane dual carriageway motorway with a central median for
Read MoreCranbourne Line Upgrade – Eumemmerring Creek Bridge – Environmental Outcomes
Describe WHAT you have done and HOW you have done it. The Eumemmerring Creek Bridge was constructed as part of the Cranbourne Line Upgrade, delivered by the Level Crossing Removal Project’s Western Program Alliance (LXRP, MTM, McConnell Dowell, Mott MacDonald and Arup) and involved the duplication of the train track over the Hallam Main Drain and Eumemmerring Creek (E
Read MoreEnergyConnect – Environmental Outcomes
Describe WHAT you have done and HOW you have done it. ElectraNet and Transgrid are partnering to deliver an energy interconnector between the power grids of SA and NSW, with an added connection to Victoria. The NSW section of EnergyConnect is the first project of its kind in Australia to undertake IS Design and As-built ratings. Transgrid’s construction delivery
Read MoreParramatta Light Rail Stage 1 – Environmental Outcomes
Describe WHAT you have done and HOW you have done it. The Parramatta Light Rail (PLR) Stage 1 project continues to deliver beneficial, measurable, and enduring outcomes for the natural environment, through innovations such as: • an Australian-first encapsulating rail boot system to reduce operational noise and vibration • the use of macro synthetic fibres in the concrete track
Read MoreTownsville Ring Road (Stage 5) – Re-introduction of Endangered Species through Environmentally Focused Design & Construction – Environmental Outcomes
Describe WHAT you have done and HOW you have done it. The Black-throated finch (southern sub-species) (Poephila cincta cincta) (BTF), classified as ‘Endangered’ under the Commonwealth Environment Protection and Biodiversity Conservation Act 1999 and ‘Endangered’ under the Queensland Nature Conservation Act 1992 , is a critical aspect of Townsville Ring Road Stage 5 (TRR5) project’s environment and sustainability goals.
Read MoreInnovative use of recycled crushed glass as sand replacement in structural concrete – Tunnels & Stations, Metro Tunnel Project – Environmental Outcomes
Describe WHAT you have done and HOW you have done it. CYP Design & Construction (CYP D&C) is supporting an innovative research study including field trials using recycled crushed glass from kerbside waste as a sand replacement in structural concrete. CYP D&C – a consortium consisting of John Holland Pty Ltd, Lend Lease Melbourne Metro Pty Ltd and Bouygues
Read More