"[" - ISCouncil

LXRP – SPA – Additional Works Package 4 (AWP4) – Design

Description:  The Additional Works Package 4 (AWP4) involves the removal of 2 level crossings through a rail under scenario (Glen Huntly Rd & Neerim Rd), construction of a new station (Glen Huntly station) & signalling improvements at Caulfield Junction.  Rating Highlights  Category  Credits  Achievements/Risks  Management Systems  Man-6  The Project achieved a verified level of 3

Read More

Western Packages (Cherry St, Werribee Street & Old Geelong Road Level Crossing Removals)

Description The Western Packages (Cherry Street, Werribee Street and Old Geelong Road Level Crossing Removals) consists of 3 level crossing removal projects delivered in the Werribee/Hoppers Crossing region. These projects are delivered by the Western Program Alliance to remove the 3 boom gates and increase trains running on the Werribee line. As part of these

Read More

Townsville Ring Road Stage 5 – Design

Description: The Townsville Ring Road Stage 5 (TRR5) project will deliver improved road safety, efficiency and travel time reliability for freight and passenger vehicles on the Bruce Highway in Townsville. The project forms part of a larger 36-kilometre section of highway known locally as the Ring Road with the TRR5 project being the final component

Read More

M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh

Description The Varsity Lakes to Burleigh package is under the M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun Program   In this 2km section of the overarching Varsity Lakes to Tugun upgrade, the department has:    widened the M1 to a minimum of 3 lanes in both directions   extended and relocated the Exit 85 northbound off-ramp

Read More

More Trains More Services 2- South Works Package

Description: Laing O’Rourke has partnered with KBR and Transport for NSW to deliver the More Trains, More Services (MTMS) Stage 2 South works package. The partnership, known as Transport for Tomorrow, is upgrading the T4 Eastern Suburbs and Illawarra Line and the South Coast Line for the MTMS2 South package.  The improvements are delivering greater

Read More

Bexley North and Petersham Station Upgrades

Project Description The Bexley North and Petersham station upgrade projects included a range of works to improve accessibility, security and amenity for public transport users. The two stations were upgraded as part of the TfNSW TAP3 program which aims to provide universal access and compliance with disability legislation.  The scope of works included utilities works

Read More

The Northern Road Upgrade Stage 4

Description The Northern Road Upgrade – Stage 4 realigned 5.5km of The Northern Road around the future Western Sydney Airport site. Stage 4 included the construction of a four-lane divided road and the adjustment of public utilities. It will improve traffic flow and connectivity in the western Sydney region and facilitate the construction of Western

Read More

Parkes Water Treatment Plant

Project Complete renewal of the Parkes Water Treatment Plant (WTP) and Sewage Treatment Plant (STP), both on new premises. The project also includes the construction of a new Advanced Water Recycling Facility (AWRF) downstream of the STP, plus a new sewage pumping station and rising main that conveys inflows to the new STP.  Highlights Climate

Read More

City Rail Link – Enabling Works Contract 1 

Rating Highlights: Management systems   Well defined and integrated sustainability management system  CRL communications framework outlines a requirement for an annual sustainability report which will detail performance on the Infrastructure Sustainability Rating, zero waste to landfill, engagement with Mana Whenua, calculating a carbon footprint and materials monitoring. This will be distributed to the public during August 2016.   Sustainability reporting and

Read More