Search Results for: -水疗会所外围(高级资源)ryxzs
Townsville Ring Road Stage 5 – Design
Description: The Townsville Ring Road Stage 5 (TRR5) project will deliver improved road safety, efficiency and travel time reliability for freight and passenger vehicles on the Bruce Highway in Townsville. The project forms part of a larger 36-kilometre section of highway known locally as the Ring Road with the TRR5 project being the final component
Read MoreLathams Road Upgrade Project – Design
Overview The Lathams Road Upgrade Project involved the duplication and widening of Lathams Road from two lanes to four lanes between Oliphant Way and Frankston-Dandenong Road, including a new bridge over the Mornington Peninsula Freeway and widening and tie-in to the EastLink entry and exit ramps to Oliphant Way. The length of carriageway upgraded is
Read MoreCranbourne Line Upgrade (Package A)
The Cranbourne Line Upgrade (CLU) is a rail enhancement project to be delivered jointly by the Western Program Alliance (WPA) and the South Eastern Program Alliance (SEPA) and consists of
Read MoreThe New Murray Bridge Wastewater Treatment Plant
The existing wastewater treatment plant is located south east of the Murray Bridge township and adjacent to the River Murray and was constructed in 1970. Since this time Murray Bridge has…
Read MoreM1 Pacific Motorway Upgrade Varsity Lakes to Burleigh
Description The Varsity Lakes to Burleigh package is under the M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun Program In this 2km section of the overarching Varsity Lakes to Tugun upgrade, the department has: widened the M1 to a minimum of 3 lanes in both directions extended and relocated the Exit 85 northbound off-ramp
Read MoreM1 Pacific Motorway Upgrade Palm Beach to Tugun
Rating Highlights Category Credits Achievements/Risks Energy and Carbon Ene-1 This project achieved a level 2.43 and a verified score of 8.94. This project achieved this using 3 renewable technologies. These include: Biofuel Consumption Wind Farm Solar Photovoltaic (PV) arrays Due to the use of these renewable technologies, it has allowed there to be an increase
Read MoreM1 Pacific Motorway Upgrade Burleigh to Palm Beach
J202 – M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun Package Number J323 J324 J325 Package Name M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh M1 Pacific Motorway Upgrade Palm Beach to Tugun M1 Pacific Motorway Upgrade Burleigh to Palm Beach Capex ($m) 96.8 270.2 208.2 Certified Score 81.62 79.11 81.74 Overall Weighted Average 80.49
Read MoreSouth Gippsland Highway Level Crossing Project
The South Gippsland Highway level crossing impedes the flow of 31,000 cars and trucks each weekday, with boom gates down for a third of the two-hour morning peak. The Victorian Government announced the removal of this crossing in November 2018 as one of 25 additional new crossings to be removed. The final design solution was
Read MoreTransport Access Program 3 – Como Station Upgrade
Project Description The Como Station Upgrade Project (the Project) is part of the third tranche of Transport for NSW’s (TfNSW) Transport Access Program, known as TAP 3 and seeks to improve access to public transport for people with disability or limited mobility, parents and careers with prams, and customers with luggage. Providing accessible transport services
Read MoreMore Trains More Services 2- South Works Package
Description: Laing O’Rourke has partnered with KBR and Transport for NSW to deliver the More Trains, More Services (MTMS) Stage 2 South works package. The partnership, known as Transport for Tomorrow, is upgrading the T4 Eastern Suburbs and Illawarra Line and the South Coast Line for the MTMS2 South package. The improvements are delivering greater
Read MoreMoorebank Logistics Park Operations
Moorebank Logistics Park is a nationally significant infrastructure development that will transform the way containerised freight moves through Port Botany and deliver a faster, simpler and more
Read MoreBexley North and Petersham Station Upgrades
Project Description The Bexley North and Petersham station upgrade projects included a range of works to improve accessibility, security and amenity for public transport users. The two stations were upgraded as part of the TfNSW TAP3 program which aims to provide universal access and compliance with disability legislation. The scope of works included utilities works
Read More