IS Ratings Directory

The Infrastructure Sustainability Ratings Directory

Review all the most progressive assets and projects registered and certified with the ISC for an IS Rating. If your asset or project is not listed below, please speak to your IS Project Manager or contact casemanager@iscouncil.org for more information.

  • Undergoing a Rating
  • Road

South Australia Road Network Maintenance

SA / Operation

The State road network in South Australia is one of the state’s biggest infrastructure assets and covers approximately 25% of the state’s total road network. The network consists of over 13,000km of sealed roads and 10,000km of unsealed roads, tunnels, bridges, traffic signals, signage, verge and drainage. DM Roads are responsible for maintaining Zones 1 (metro) and 3 (North) of the network and deliver a combination of Base Service, Minor Works, Annual Renewal Works and Minor capital works.

Read More
  • Certified
  • Rail

South Eastern Program Alliance – Union & Mont Albert Level Crossing Removal Project

VIC / As Built

Description The Union & Mont Albert Rd Level Crossing Removal Project is located on the Belgrave / Lilydale rail line, approximately 12 km east of the Melbourne CBD. The project boundary is located within the City of Booroondara and the Whitehorse City Council municipalities in the suburbs of Surrey Hills and Mont Albert. The level

Read More
  • Certified
  • Road

South Gippsland Highway Level Crossing Project

VIC / Design

The South Gippsland Highway level crossing impedes the flow of 31,000 cars and trucks each weekday, with boom gates down for a third of the two-hour morning peak. The Victorian Government announced the removal of this crossing in November 2018 as one of 25 additional new crossings to be removed. The final design solution was

Read More
  • Certified
  • Road

South Gippsland Highway Level Crossing Project

VIC / V 1.2 As Built

Description The South Gippsland Highway level crossing impedes the flow of 31,000 cars and trucks each weekday, with boom gates down for a third of the two-hour morning peak. The Victorian Government announced the removal of this crossing in November 2018 as one of 25 additional new crossings to be removed. The final design solution

Read More
  • Certified
  • Rail

Stockinbingal to Parkes – Daroobalgie and Wyndham Avenue Sites

NSW / Design

Description The Stockinbingal to Parkes section of the Inland Rail alignment is an enhancement project modifying specific sites along 170km of existing rail in regional New South Wales. The works planned to be completed as part of this project are: – Increasing vertical clearance under the Wyndham Avenue road bridge in Forbes; and – Building

Read More
  • Certified
  • Road

Sunbury Road Upgrade Project

VIC / As Built

Description Sunbury Road provides direct access to the Tullamarine Freeway, connecting road users with high capacity links to Melbourne’s CBD, the wider metropolitan area, as well as regional Victoria and interstate. It is also the primary route for trips from within the corridor to key employment hubs in Melbourne’s north including Epping, Somerton and Broadmeadows.

Read More
  • Certified
  • Rail Road

Swan River Crossings

WA / Planning

Description The Project involves the construction of a dual carriageway road bridge over the Swan River, between the alignment of the existing Fremantle Traffic Bridge and the existing Fremantle Rail Bridge. The Project also includes the development, design and construction of an extension to the Fremantle Principal Shared Path (PSP) from the North Fremantle Station

Read More
  • Certified
  • Road

Sydney Harbour Tunnel Motorway – IS Operations Rating (1-Year)

NSW / Operation

Description Ventia commenced asset management services for the Sydney Harbour Tunnel (SHT) on September 1, 2022. The contract with Transport for NSW encompasses tunnel operations, asset management and lifecycle management. The Sydney Harbour Tunnel, which opened in 1992, is the first and only under-harbour motorway crossing, and has a transverse ventilation system and bespoke control

Read More
  • Certified
  • Rail

Sydney Metro – Western Sydney Airport, Station Boxes and Tunnelling Works

NSW / Design

Description The Sydney Metro – Western Sydney Airport, Station Boxes and Tunnelling Works (SBT) forms part of the broader Sydney Metro network.   The SBT scope includes:  The design and construction of two sections of twin tunnels with a combined length of approximately 9.8 kilometres  Associated portal structures, station boxes, services shafts, temporary ground support, cross

Read More
  • Certified
  • Rail

Sydney Metro City & SW – Line-wide Works

NSW / Design

Description: The Sydney Metro City & Southwest (SMCSW) project will extend Sydney Metro Northwest to the CBD through Chatswood and beyond to Bankstown. The project is being delivered through a suite of contracts for the tunnels, stations, line-wide infrastructure and systems. The Line-wide Works (LW Works) package is a key component of SMCSW with works

Read More
  • Certified
  • Rail

Sydney Metro City and Southwest – Central Station Main Works

NSW / As Built

Description Sydney Metro is Australia’s largest public transport project, transforming Sydney with more trains and faster services. At Central Station, construction includes:  Two new underground concourses  North-South Concourse above the new Metro station  Central Walk for better connectivity to trains, light rail, and new Metro platforms  Demolition and reconstruction of suburban rail platforms 12, 13,

Read More
  • Certified
  • Rail

Sydney Metro Northwest – Surface and Viaduct Civils

NSW / As Built

The $8.3 billion Sydney Metro Northwest is Australia’s biggest public transport project and a priority infrastructure investment for the NSW Government. It is the first stage of Sydney Rapid...

Read More
  • Certified
  • Rail

Sydney Metro West – Central Tunnel Package

NSW / Design

Description The Sydney Metro West – Central Tunnelling Package contract includes the delivery of twin 11 kilometre tunnels and excavation of five station boxes at Sydney Olympic Park, North Strathfield, Burwood North, Five Dock and The Bays. A crossover cavern at Burwood North and one of the two precast facilities at Eastern Creek where more

Read More
  • Undergoing a Rating
  • Rail

Sydney Metro West – Eastern Tunnelling Package

NSW / As Built Design

The Sydney Metro West, Eastern Tunnelling Package (ETP) involves the delivery of: – Enabling works such as demolition, utility supply to construction sites, utility adjustments and modifications to the existing transport network – Mined crossover cavern construction east of The Bays Station – 4.2km of TBM Tunnel excavation, 650m of mined tunnels and 7 cross

Read More
  • Certified
  • Rail

Sydney Metro West – Western Tunnelling Package (WTP)

NSW / Design

Description The NSW Government is delivering Sydney Metro West – a new underground metro railway which will double rail capacity between Parramatta and the Sydney CBD, link new communities to rail services and support employment growth and housing supply. The Gamuda and Laing O’Rourke Consortium (GLC) is delivering the Sydney Metro West – Western Tunnelling

Read More
  • Certified
  • Road

Takitimu North Link Stage 1

NZ / Design

Description The Takitimu North Link Stage 1 project is a Crown funded new 6.8km 4-lane expressway between Tauranga and Te Puna, providing an alternative route to the existing State Highway 2 (SH2). This major infrastructure project, currently in construction, is the Bay of Plenty’s biggest roading project to date that enables people and freight to

Read More
  • Registered
  • Road

Takitimu North Link Stage 2A

NZ / Design & As Built

We are pleased to announce that the team at Bloxam Burnett & Olliver is joining the IS Rating scheme with their work on NZTA Waka Kotahi’s Takitimu North Link Stage 2, which is the 7.7km section of the project between Te Puna and Ōmokoroa. This section forms the connection between Stages 1 and 2 of

Read More
  • Certified
  • Rail

TAP 3 – Killara and Turrella Stations Upgrades

NSW / Design

Description The Transport Access Program (TAP) aims to enhance the experience of public transport customers by providing accessible, modern, secure, and integrated transport infrastructure.  Upgrades to two existing train stations will include the following:  Construction of new lifts for access to station platforms and existing footbridges, complete with lift landings, canopies, throw screens, and support

Read More
  • Certified
  • Rail

TAP 3- Erskineville, St Peters, Normanhurst, Thornleigh, Pymble, Doonside Stations Upgrade

NSW / Design

Description The Transport for New South Wales (TfNSW) Transport Access Program (TAP) is an initiative to provide a better experience for public transport customers by delivering accessible, modern, secure and integrated transport infrastructure.    This project consists of six station upgrades which are delivered under Laing O’Rourke’s Managing Contractor Contract. The six stations are referred to

Read More
  • Certified
  • Rail

TAP3 – Towradgi Station Upgrade

NSW / V 1.2 Design and As Built

The Towradgi Station Upgrade Project was part of the third tranche of Transport for NSW’s Transport Access Program, known as TAP 3, which seeks to improve access to public transport for people with disability or limited mobility, parents and careers with prams, and customers with luggage. Providing accessible transport services for everyone in the community

Read More
  • Certified
  • Rail

TAP3 – Unanderra Station Upgrade

NSW / V 1.2 Design and As Built

The Unanderra Station Upgrade Project (the Project) is part of the third tranche of Transport for NSW’s Transport Access Program, known as TAP 3 and seeks to improve access to public transport for people with disability or limited mobility, parents and careers with prams, and customers with luggage. Providing accessible transport services for everyone in

Read More
  • Certified
  • Rail

TAP3 Birrong Station, Wollstonecraft Station, Roseville Station, Banksia Station and Canley Vale Station

NSW / Design

Project Description The project is part of the NSW Government’s the Transport Access Program, which aims to provide a better experience for public transport customers by delivering accessible, modern, secure and integrated transport infrastructure. Under the TAP program, five train stations were upgraded to provide accessible access to people with a disability, limited mobility, parents/carers

Read More
  • Certified
  • Rail

TAP3 Waitara Station

NSW / Design

Description: The upgrade works (the Project) were completed for Waitara Station as part of the Transport Access Program, an NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state. Providing accessible transport services for everyone in the community is one of the six priorities for Transport for NSW’s Future Transport Strategy.

Read More
  • Certified
  • Road

Te Ahu a Turanga Manawatū Tararua Highway

NZ / Design

Description Te Ahu a Turanga: Manawatū Tararua Highway. is an 11.5km new highway between Woodville & Ashhurst, with two lanes each way.   A major slip in April 2017 left SH3 through the Manawatū Gorge impassable. This new road is being built over the Ruahine Range, to provide a safe, resilient, and efficient route.   The

Read More
  • Certified
  • Cycleways and footpaths

Te Ara Tupua Alliance

NZ / Design

Description Te Ara Tupua will create a new resilient coastal edge which will protect road and rail and provide a safe and attractive walking and cycling link between Wellington and Lower Hutt.  Rating Highlights  Category  Credits  Achievements  Heritage  Her-1  The strong relationship between the NZ Transport Agency Waka Kotahi and mana whenua has been fundamental in

Read More
  • Certified
  • Open Space

Te Kori Scott Point

NZ / Design

Te Kori Scott Point is a 16.4ha area of land in the northwest of Auckland that is about to be transformed from a rural landscape to a public park to meet the needs of a new community.

Read More
  • Certified
  • Rail

TfNSW Hawkesbury River and Warrawee Station Access Upgrades (TAP3)

NSW / Design

Project Description The Hawkesbury River and Warrawee upgrade works (the Project) were completed as part of the Transport Access Program (TAP), a NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state. Providing accessible transport services for everyone in the community is one of the six priorities for Transport for NSW’s

Read More
  • Certified
  • Rail

TfNSW Wahroonga, Narara and Lisarow Station Access Upgrades (TAP3)

NSW / As Built

Description: The Transport Access Program (TAP) is a NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state, improving access to public transport for people with disability or limited mobility, and parents and carers with prams. This particular TAP 3 project scope includes the Wahroonga, Lisarow, and Narara train station upgrades.

Read More
  • Certified
  • Rail

TfNSW Wahroonga, Narara and Lisarow Station Access Upgrades (TAP3)

NSW / Design

Description In summary, the TAP initiative exemplifies the commitment of the NSW Government to create a more inclusive and accessible public transport network. The improvements at Wahroonga, Lisarow, and Narara railway stations mark significant milestones in achieving this goal, with a focus on enhancing accessibility, safety, and convenience for all commuters.   Rating Highlights  Category  Credits 

Read More